Low Voltage Solutions for Educational Buildings
Learn About Our Services & Recent Projects in Arizona
Corporate Technology Solutions specializes in the installation and design of voice data, video, fiber optic, and structured cabling systems for school systems and educational buildings throughout the Southwest. Our dedication to quality is unsurpassed in the industry—we have even been awarded the largest educational contracts in the state of Arizona.
Our services for educational buildings and campuses include:
- Paging and intercom systems
- Access control systems
- Wireless/Wi-Fi systems
- Mass notification systems
- Structured cabling upgrades
- Video surveillance and CCTV systems
Ready to get started? Give us a call today to talk about the solutions we can provide, including cabling upgrades, access control systems, and paging/intercom integration—or keep reading to learn more about our featured service and see recently completed projects from our team!
Northern Arizona University – Flagstaff, Arizona
Addressable Networked System for Voice Evacuation and Tenant Notification
Project Statistics: Year: 2014 CTS Contract Value: $1,200,000.00 Bonded: No | Owner: Northern Arizona University | Project Type: Design Build |
General Contractor: Core Construction, Phoenix, Arizona | CTS Personnel: Estimator, Dennis Greenawalt Project Manager , Jeff Turner |
Project Description
Corporate Technology Solutions was selected by Core Construction to be the design-build special systems firm to work with the NAU construction services department, Core Construction, architects and engineering firms to upgrade grade systems in five (5) existing dormitory complexes at NAU totaling 29 buildings.
The project is expected to take two years to complete with the majority of the work finishing in August 2014. We will be working with Core Construction closely to develop project goals and objectives then coordinating our efforts with several other trades on the project.
Due to the tight time frame for installation Corporate Technology Solutions will stage, program and test the majority of the new system at our Tempe, Arizona facility then deploy them to the sites for efficiency. We will also tie the new Notifier systems into the Notifier OnyxWorks Master NAU FACP/ECS Head End.
Our structured cabling division will also be involved during the construction working with Core Construction to relocate existing telecommunication facilities and Wi-Fi networks to accommodate the new construction efforts.
We are very excited to be part of Core Construction’s team and look forward to working with them on this exciting project.
Paradise Valley Unified Schools
Larkspur Elementary Remodel, Phoenix, Arizona
Project Statistics: Year: 2012 CTS Contract Value: $350,000.00 Bonded: No | Owner: Paradise Valley Unified School District | Architect: HDA Architects, Phoenix Arizona |
General Contractor: Core Construction, Phoenix, Arizona | CTS Personnel: Estimator Scott Tubbs and Dennis Greenawalt Project Manager Dennis Greenawalt |
Project Description
Corporate Technology Solutions was selected by Core Construction to assist in the design and build of the Larkspur Elementary School re-model project. The project consisted of demolishing the majority of buildings on the campus while keeping the school functional through the school year.
This was no easy task and required special attention to details and coordination with all the trades on the project. This required us to install several temporary back bone systems to keep the data, voice, fire, security, intercom and surveillance systems running during construction.
The project took over 9 months to complete and during that time we installed a new category 6 data communication network supporting the data, voice, video, Wi-Fi and camera system. We also installed a new video surveillance system, IDS System, atomic clocks and intercom paging systems in-house.
Amphitheater Public Schools
Canyon Del Oro HS Remodel – Tucson, Arizona
Project Statistics: Year: 2012 CTS Contract Value: $800,000.00 Bonded: No | Owner: Amphitheater Public Schools | Architect: GLHN Tucson, Arizona |
General Contractor: Lloyd Construction, Tucson Arizona | CTS Personnel: Estimator Diego Dancil, RCDD Project Manager Sam Rhodes, RCDD |
Project Description
In early 2012, Corporate Technology Solutions was awarded the contract to supply and install a completely new structured cabling system and the intercom paging systems for the Canyon Del Oro High School re-model project.
The project consisted of installing a completely new Category 6 infrastructure to support their data, voice, video and Wi-Fi networks campus-wide. We also installed a new single-mode fiber optic backbone system to support the data communications between the MDF room to (15) IDF rooms on the campus.
We installed a mass notification system campus-wide utilizing the Notifier product line.
Kingman Unified School District, District-Wide Technology Upgrade Design-Build
Project Statistics: Year: 2009-2012 CTS Contract Value: 1,895,000.00. (3) New Schools and District Office Complex remodel. Bonded: No | Owner: Kingman Unified School District # 20, Kingman Arizona | Architect: DLR Architects, Phoenix, Arizona |
General Contractor: Core Construction 3636 Greenway Road Phoenix, Arizona 85231 | CTS Personnel: Designer, Scott Tubbs Project Manager, Brian Vallejo, Site Foreman, Steve Coleman |
Gilbert Public Schools
Campo Verde High School: Gilbert, AZ
Project Statistics: Year: 2009 CTS Contract Value: $420,000.00 SF: 250,000 – Bonded: No |
Owner: Gilbert Public Schools 140 South Gilbert Road Gilbert, Arizona 85296 |
Architect: 459 N. Gilbert Road Suite C-200 Gilbert, AZ 85234 |
General Contractor: Core Construction 3636 Greenway Road Phoenix, Arizona 85231 |
CTS Personnel: Estimator: Scott Tubbs Project Manager: Chad Blotkamp Site Foreman: Brian Sands |
Project Description:
- Provided and installed a complete in-ceiling cable support system
- Provided and installed over (475) work area outlets in 6 buildings. Each outlet consisted of 2 data cables and 1 voice cable
- Corporate Technology Solutions built out one main telecommunication closet (MTC) and (5) telecommunication closets (TC). Each telecommunication closet comprised of open frame relay racks, cabinets, grounding systems and cable tray
- Provided a large fiber optic backbone cabling system installation which comprised of 12MM 50um and 12 SM optical fiber strands feeding from the MTC to each TC closet
- Provided and installed (1) 100pr PE 89 from the MTC room to each TC room
- Provided and installed a coaxial CATV system including a .500 osp coax backbone, TV locations, and head-end room build-outs
Maricopa Community Colleges District Office Cabling Upgrade Project: Tempe, AZ
Project Statistics: Year: 2005 CTS Contract Value: $285,000.00 SF: 125,000 – Bonded: No |
Owner: Maricopa Community Colleges 2411 West 14th Street Tempe, Arizona 85288 |
Architect: None |
General Contractor: CTS 1971 E. 5th Street, Suite 111, Tempe, Arizona 85288 |
CTS Personnel: Estimator: Brian Rhynas, RCDD Project Manager: Brian Rhynas, RCDD Site Foreman: Chad Blotkamp |
Project Description:
- Corporate Technology Solutions was awarded the contract to supply and install the structured cabling system for the Maricopa Community Colleges District office, just east of Phoenix in Tempe. The project objective was to update the structured cabling system infrastructure from a CAT3/CAT5 cable infrastructure to a CAT 6 infrastructure to support the installation of a new VOIP system and increase the bandwidth required for new applications.
- 1,100 work area locations consisting of (2) CAT6.
- 6 telecommunication closets – 6 floors
- Cable Demolition of the old cabling infrastructure
- New in-ceiling cable support system
Gilbert Public Schools – District Wide Wireless Access Point Deployment: Gilbert, AZ
Project Statistics: Year: 2009 / 2010 CTS Contract Value: $963,000.00 SF: N/A – Bonded: No |
Owner: Gilbert Public Schools 140 South Gilbert Road Gilbert, Arizona 85296 |
Architect: None |
General Contractor: CTS 1971 E. 5th Street Suite 111 Tempe, Arizona 85288 |
CTS Personnel: Estimator: Scott Tubbs Project Manager: Chad Blotkamp Site Foreman: Armondo Zevallos |
Project Description:
- Corporate Technology Solutions was contracted directly with Gilbert Public Schools in conjunction with Hewett Packard to deploy and install 2,500 wireless access points in 36 school facilities district-wide.
- We provided and installed (1) category 6 cable from each access point to the nearest telecommunication closet, terminated, tested and labeled. In addition, we provided wireless access point installation and patched in at the telecommunication closet.
- During the installation, we were also tasked with re-testing and confirming all the fiber optic backbone system’s met 10gig requirements for the deployment.
- We worked very closely with the GPS IT department throughout the wireless installation to ensure that all the access points were active and working properly to meet the school’s on-going data needs for it students and facility staff members.
Our Service Area for Educational Low Voltage Solutions
We service the following areas:
Phoenix/Tempe Office: Avondale, Buckeye, Chandler, El Mirage, Gilbert, Glendale, Goodyear, Mesa, Peoria, Scottsdale, Sun City West, Surprise, Tempe, Tolleson, Queen Creek and the surrounding areas
Tucson Office: Avra Valley, Catalina Foothills, Flowing Wells, Green Valley, Littletown, Marana, Oro Valley, Picture Rocks, Sahuarita, Summit, Tanque Verde, Three Points, Tortolita, Valencia West, and the surrounding areas