Low Voltage Solutions for Government Buildings
Learn About Our Services & Recent Projects in the Southwest
From crime labs to city offices and military facilities to detention centers, governmental buildings rely heavily on low voltage solutions. A well-integrated and -designed low voltage system can greatly impact the day-to-day operations of such buildings. Corporate Technology Solutions has worked with many government offices and buildings in providing custom-designed, installed, and integrated low voltage solutions throughout the Southwest.
Our services for federal, state, and local government buildings and offices include:
- Paging and intercom systems
- Access control systems
- Wireless/Wi-Fi systems
- Mass notification systems
- Video surveillance and CCTV systems
- And more
Ready to get started? Give us a call today to talk about the solutions we can provide, including access control systems and structured cabling upgrades, for your building—or keep reading to learn more about our featured service and see recently completed projects from our team!
City of Phoenix
ITOC Data Center and I/O Data Center Installation: Phoenix, Arizona
Project Statistics Year: 2011-2015CTS Contract Value: $ 800,000.00SF: N/A Bonded: No | Project Owner City of PhoenixPhoenix, Arizona | Design Team COP IT Team,Cisco Systems and CTS |
General Contractor: Corporate Technology Solutions, Tempe, Arizona | CTS Personnel Estimator: Garrett McFadden Project Manager: Chad Blotkamp |
Project Description:
Corporate Technology Solutions was contracted for a multi-year build out of two data centers for the City Phoenix. The existing data center (ITOC) is located in down town Phoenix with approximately 20,000 SQ FT of data center floor. In 2012, the City decided to build a secondary Data Center in the I/O Phoenix Data Center Facility.
The first task in the build out was to connect the downtown data center via fiber to the I/O facility. To accommodate this requirement, Corporate Technology Solutions installed (2) new 144SMFO cable from the downtown data center to the I/O facility in a redundant ring.
We have provided and installed year to date a total of (16) HDA rows with (8) cabinets in each row and (4) MDA rows, new 24 strand MM 50um OM4 data center trunks, CAT6A 10gig snap cables, and all new cable tray in both locations.
Today we continue to work with the City installing HDA rows in both sites and will be installing new rows in the ITOC data center in the spring of 2014.
The Arizona Department of Transportation
20 Years of Trusted Technology Partnership
Project Description
Since 2001, the Arizona Department of Transportation (ADOT) has trusted Corporate Technology Solutions (CTS) for low-voltage cabling and connectivity infrastructure. Thanks to a detailed design and assessment process, CTS has served as a long-term partner for ADOT.
The responsive nature of Corporate Technology Solutions allowed the Arizona Department of Transportation to move forward quickly and complete projects ahead of schedule. Whether installing cabling in offices, conference rooms, yards, or work bays, Corporate Technology Solutions continues to make their expertise a vital component for all areas of ADOT’s vision for their facilities.
City of Maricopa
Copper Sky Recreation Complex, Maricopa, Arizona
Project Statistics: Year: 2013 CTS Contract Value: $350,0000 SF: 125,000 – Bonded: No | Owner: City of Maricopa | Design Team: CTS |
General Contractor: Core Construction, Phoenix, Arizona | CTS Personnel: Project Manager: Dennis Greenawalt, Site Foreman: Jeff Turner |
Project Description
Corporate Technology Solutions was awarded the special systems design/build contract from Core Construction in mid-2012 for the new then named Multigenerational Center and Regional Park in the City of Maricopa, Arizona.
The systems included the data, voice and video cabling infrastructure, fiber optic backbone system, fire alarm, video surveillance, instruction detection and access control.
We worked very closely with the general contractor, architects, design engineers and the electrical engineers throughout the process to provide high end complete systems for the City of Maricopa.
We self-performed the installation of all these systems utilizing in house highly trained project managers, technicians, programmers and engineers providing our customer a complete turnkey special system installation.
City of Phoenix, Phoenix Convention Center: Phoenix, AZ
Project Statistics: Year: 2006 CTS Contract Value: $1,535,000.00 SF: 750,000 – Bonded: No |
Owner: City of Phoenix 210 W. Washington, Basement Phoenix, Arizona 85003 |
Architect: HOK 9530 Jefferson Boulevard Culver City, CA 90232 |
General Contractor: Hunt Construction 426 North 44th Street, Suite 410 Phoenix, AZ 85008 |
CTS Personnel: Estimator: Scott Tubbs Project Manager: Chad Blotkamp Site Foreman: Dave Martinez |
Project Description:
- Corporate Technology Solutions was awarded the contract directly with the City of Phoenix to supply and install the structured cabling system for the new Phoenix Convention Center West Building and South Re-model projects.
- 1,300 work area outlets of structured cable consisting of (4) CAT6E,(4)MM 62.5 optical fibers and (4)SM optical fibers
- 31 telecommunication closets (west and south buildings) – 6 Levels
- Fiber Optic Backbone System – 48MM/24SM from the MTC to each TC room
- Performed over 13,000 optical fiber termination in the horizontal and riser system
- Large Copper Backbone System
- Completed all voice and data cross connects
City of Phoenix, Phoenix Crime Laboratory: Phoenix, AZ
Project Statistics: Year: 2007 CTS Contract Value: $330,000.00 SF: 152,000 – Bonded: No |
Owner: City of Phoenix 210 W. Washington, Basement Phoenix, AZ 85003 |
Architect: McClaren, Wilson and Lawrie 8705 N. Central Ave Phoenix, Arizona 85008 |
General Contractor: Gilbane Construction 2111 East Highland, Suite 350 Phoenix, AZ 85016 |
CTS Personnel: Estimator: Scott Tubbs Project Manager: Chad Blotkamp Site Foreman: Brian Sands |
Project Description:
- Corporate Technology Solutions was awarded the contract with the City of Phoenix ITD department to supply and install the structured cabling system for the new Phoenix Crime Lab. When the crime lab is completed (estimated mid 2007) it will be the most technology advanced crime lab in the country. CTS worked very closely with the Phoenix Police Technology staff and the Phoenix Information Technology Department to ensure that all the structured cabling requirements were met.
- 1,100 work area locations consisting of (2) CAT6E
- 7 telecommunication closets – 3 floors
- Large Fiber Optic Backbone System – 48MM/24SM from the MTC to each TC room
- Copper Backbone System – Consisted of 300pr (ARMM) CAT 3 to each telecommunication room
Arizona National Guard Readiness Center: Buckeye, AZ
Project Statistics: Year: 2008 / 2009 CTS Contract Value: $250,000.00 SF: 110,000 – Bonded: No |
Owner: Arizona National Guard Phoenix, AZ |
Architect: Burns and McDonnell 4742 N. 24th Street STE 355 Phoenix, Arizona 85016 |
General Contractor: Sundt Construction 2620 S. 55th Street Tempe, Arizona 85282 |
CTS Personnel: Estimator: Scott Tubbs Project Manager: Brian Vallejo Site Foreman: Danny Lujan |
Project Description:
- Provided and installed a complete in ceiling cable support system
- Provided and installed over (150) work area outlets in (6) buildings. Each outlet consisted of 2 data cables and 2 voice cables
- Corporate Technology Solutions built out one main telecommunication closet (MTC) and (5) telecommunication closets (TC). Each telecommunication closet comprised of open frame relay racks, cabinets, grounding systems and cable tray
- Provided and installed a large fiber optic backbone system comprised of 24MM 50um and 12 SM optical fiber strands feeding from the MTC to each TC closet
- Provided and installed (1) 100pr PE 89 from the MTC room to each TC room
- Provided and installed the fire alarm system cabling infrastructure
Santa Cruz County Justice and Detention Center: Nogales, AZ
Project Statistics: Year: 2009 / 2010 CTS Contract Value: $3000,000.00 SF: 125,000 – Bonded: Yes |
Owner: Santa Cruz County 2150 North Congress Drive Nogales, Arizona 85621 |
Architect: DLR Group 6225 N. 24th Street, Ste 250 Phoenix, Arizona 85016 |
General Contractor: Core Construction 3636 Greenway Rd Phoenix, AZ 85032 |
CTS Personnel: Estimator: Scott Tubbs Project Manager: Drew Tucker Site Foreman: David Leon |
Project Description:
- Product: Sumitomo Air Blown Fiber/Ortronics/Berk-Tek
- Corporate Technology Solutions has been contracted to install a new Information Transport System (ITS) for the new Santa Cruz Detention Center located in Nogales, Arizona.
- The system includes a new Sumitomo air blown fiber optic backbone, large copper backbone system and the installation of a new horizontal category 6 infrastructure.
- The fiber optic backbone consists of (07) cell tubes with various multi-mode and single mode fiber bundles being installed from the MTC room to (6) new TC rooms in the facility. A new 100pr copper backbone will be installed from the MTC room out to (6) new TC rooms to support various pots and 1FB lines. In addition, we will be installing over 700 plus new category 6 cable to over 250 locations.
- Corporate Technology Solutions is also responsible for the build of a large MTC room and 6 new TC rooms located in the facility.
Featured Service: Fiber Optic Upgrades and Installation in the Southwest
At Corporate Technology Solutions, we strive to design and install a solution suited to your specific needs, and have done so for a number of government buildings and facilities, as outline above. A major area that many governmental properties benefit from our services is upgrades to their networking cabling and fiber optic systems. In just about every government project we work on, we’ve designed and built technology closets (TC) that incorporated open frame relay racks, cabinets, grounding systems, and cable tray.
Our stellar reputation for integrated, turnkey low voltage solutions makes us a great choice for a fiber optic backbone system for your government facility or campus.
Our Service Area for Government Low Voltage Solutions
We provide services throughout the following areas:
Phoenix/Tempe Office: Avondale, Buckeye, Chandler, El Mirage, Gilbert, Glendale, Goodyear, Mesa, Peoria, Scottsdale, Sun City West, Surprise, Tempe, Tolleson, Queen Creek and the surrounding areas
Tucson Office: Avra Valley, Catalina Foothills, Flowing Wells, Green Valley, Littletown, Marana, Oro Valley, Picture Rocks, Sahuarita, Summit, Tanque Verde, Three Points, Tortolita, Valencia West, and the surrounding areas